
Technique Info: Purl Three Together
| Field | Details |
|---|---|
| Abbreviation | P3tog |
| Type | Double Decrease |
| Lean | Right |
| Worked | Purlwise |
| Facing stitch | SSSP |
| Right Side stitch | K3tog |
| Related Stitches | P2tog |
| Symbols |
|

Step-by-step Instructions
Step 1:
Hold the yarn in front, insert the RH needle purlwise into the first three stitches on the LH needle.Step 2:
Wrap the yarn counterclockwise around the RH needle.Step 3:
Pull the new stitch through three stitches.Step 4:
Drop the three stitches off the LH needle.
Step-by-step Instructions
Step 1
1.1
Hold the yarn in front
1.2
Insert RH needle purlwise
Step 2
Wrap the yarn around the needle
Step 3
Pull the new stitch through three stitches
Step 4
Drop the three stitches off the LH needle
Your hands and needles want to try something new?
Make them happy with
