Technique Info
Abbreviations |
C2F, 1/1 LC |
Meaning |
Cable 2 Front |
Type |
2-stitch Cables |
Lean |
Left |
Partner |
C2B |

Step-by-step Instructions
Step 1: Transfer 2 stitches
Hold yarn in back, insert the right-hand needle purlwise into the two stitches on the left-hand needle, and slip them onto the right-hand needle.
Step 2: Work 2nd stitch on RH Needle
Insert the left-hand needle into the front of the second stitch on the right-hand needle from left to right.
Step 3: Drop stitches
Drop both stitches off the right-hand needle.
Step 4: Pick up loose stitch
Insert the right-hand needle purlwise back into the loose stitch to pick it up.
Step 5: Slip stitch back
Insert the left-hand needle into the stitch on the right-hand needle from left to right and slip it back onto the left-hand needle.
Step 6: Knit two stitches
With the yarn in back, insert the right-hand needle knitwise into the first stitch on the left-hand needle, wrap the yarn counterclockwise around the right-hand needle, and pull it through to create a new stitch. Slip the old stitch off the left-hand needle. Repeat the same process for the next stitch.
Step-By-Step Photos
Ready to level up?
Let’s meet the CABLE FAMILY